Seq Name of project Location

 

Scale (capacity, area)

field of investment invitations

 

Technical infrastructure condition and status Contact address
1 Road 266 improvement project  From the intersection of Song Cong Town to the intersection of Diem Thuy Commune, Phu Binh District

- Length: 5km
- Total investment: about VND 550 billion
- Form: Expanded investment in the form of PPP - BT

- Land condition: already planned, being cleared and compensated
- Road condition: road bed width of 7.5m; Road width of 5.5m
- Expected investment scale: 42m -wide road bed, 21m- wide road surface, 3m median strip, 18m-wide pavement 
Mr. Ta Van Thuyet - Deputy Director of Department of Transportation
Tel: 0912.024.782
2 Road 261 improvement project  Dai Tu District to Ba Hang, Pho Yen Town - Length: 50km
- Total investment: About VND 1, 300 billion
- Form: PPP-BT
- Land condition: already planned, not been cleared
 - Road condition: 6.5m-wide road bed; 3.5m- wide road
- Projected investment scale: up to grade III standards; roadbed width of 12m, asphalt concrete surface width of 8m (both reinforced margin)
Mr. Ta Van Thuyet - Deputy Director of Department of Transportation
Tel: 0912.024.782
3 Road 262 improvement project 262 From intersection of Doc Lim, Thai Nguyen City to Cach Mang thang 10 Road, Song Cong city. - Length: 11.23km
- Total investment: About VND 280 billion.
- Type: PPP - BT
 Land condition: already planned, land not yet cleared.
- Road condition: The road bed width is 6.5m, the road surface is 3.5m wide.
- Scale of investment: up to grade III standard; road bed width of 12m, road surface width of 11m (both reinforced edge)
Mr. Ta Van Thuyet - Deputy Director of Department of Transportation
Tel: 0912.024.782
4 Investment project to build ring road I Bo Dau Intersection ---> Cau River  ---> Highway 1B ---> Linh Nham Length: 28km
- Total investment: About VND 700 billion.
- Form: PPP - BT
- Land condition: already planned, land not yet cleared
- Road condition: rural road
- Projected investment scale: up to grade III standards; The road bed is 12m wide, concrete pavement surface is 5.5m wide.
Mr. Ta Van Thuyet - Deputy Director of Department of Transportation
Tel: 0912.024.782
5 Investment project to build the belt road V, linking Hanoi - Thai Nguyen Highways with the Hanoi - Lao Cai Highways Km 53 + 100 of Hanoi -Thai Nguyen Highways to Nhe peak of Pho Yen Town. - Length: 17km
- Total investment: about VND 875 billion
- Form: PPP - BT
- Land condition: already planned, not compensated for ground clearance Mr. Ta Van Thuyet - Deputy Director of Department of Transportation
Tel: 0912.024.782
6 Investment project to build the inter-District road Dai Tu - Phu Luong  Yen Lang Commune,  Dai Tu District to Du Town, Phu Luong District  - Length: 24km
- Total investment: Approximate  VND 2000 billions
- Form: PPP - BT
- Land condition: already planned, land not yet cleared.
- Current road condition: road bed width of 6.5m, road surface of 3.5m.
- Esstimated investment scale: III standard, road bed width of 12m, road surface width of 11m (including edge consolidation)
Mr. Pham Duy Hung - Chairman of District
Tel. 0983.272.069
7 Extended Road 47 project From Yen Binh crossroad to Thuan Thanh Commune, Pho Yen Town to Communes of  Tan Huong, Tan Phu, and Dong Cao - Length: 10km
- Total investment: Approximate  VND 600 billions
- Form: PPP - BT
- Current condition: intermiiten residential and farming lands
- Newly built roads
- Estimated investment scale: II standard, width of  47m
- Electricity: Using  110KV – capacity electricity plant
- Water: Thai Nguyen Clean Water JSC
Mr.  Bui Van Luong - Chairman of People’s Committee, Pho Yen Town
Tel: 0982.729.264
8 Song Cong, Bridge- tipped Functional Urban Area Project   Vinh Son Commune, Song Cong City - Area: 24,9ha
- Total investment: Approximate  VND 298.8 billions
- Current condition: Detailed and planned scale map of 1/500; Rice land: 12.3ha; Residential land: 0.26ha; Others: 12.3ha
- Electricity: appropriate electricity supply
- Water: Local clean water supply
Mr. Le Van Khoi - Chairman of People’s Committee, Song Cong City
Tel: 0913.284.929
9 The project of Urban Area along  Cong River Thang Loi, Mo Che, and Luong Chau Wards  – Song Cong City - Area: 90.8ha
- Total investment: Approximate  VND 1,089.6 billions
- Land condition: Rice land15.7ha; Residential land: 14.75ha; Others: 60.35ha
- Electricity: appropriate electricity supply
- Water: Local clean water supply
Mr. Le Van Khoi - Chairman of People’s Committee,  Song Cong City 
Tel: 0913.284.929
10 Facility Services and Urban Area of Song Cong Industrial Park II  Luong Son Ward and Tan Quang Commune, Song Cong City - Area: 46.74ha
- Total investment: Approximate  560.88 billions

- Current condition: Detailed and planned scale map of 1/500; Rice land: 15.7ha; Residential land: 11.6ha; Others: 19.4ha

- Electricity: Electricity: appropriate electricity supply:

Mr. Le Van Khoi - Chairman of People’s Committee, Song Cong City
Tel: 0913.284.929
11 Residential Area in Cu Van  Communes, Dai Tu District Cu Van  Commune, Dai Tu District - Area: 30ha
- Total investment: Approximate  VND 300 billions 
- Current condition: Planned land; Residential, Farming and intesive-fruit tree lands
- Electricity: appropriate electricity supply:
- Water: Local clean water supply
Mr. Pham Duy Hung - Chairman of District
Tel: 0983.272.069
12 Putting in ground electricity networ and infrastructure pipes; Commpleting plant arrangement, pavement and decoration of main streets  Main roads and streets in Thai Nguyen City - Length: 30km
- Total investment: Approximate  VND 500 billions
- Form: PPP - BT
- Water supply pipes are buried directly under the pavements; Parts of optical fibres and electricity wires are grounded ( at very low rate)  
- Most of optical fibres and low-voltage electricity wires are hung over but in a way that they are not overstretched  or tied to loose urban beautiful landscape.
- The degraded pavement plated with inserting bricks and long deteriorated and patchy road surface have lost the beauty of the city, in couple with insufficient and non- syncronous green trees.
Mr. Le Quang Tien  – Chairman of People’s Committee, Thai Nguyen City
Tel: 0912.999.567
13 Drainage system and Waste Water, Treatment system in the north of  city and east of Cau River  Quang Vinh, Quan Trieu, Tan Long, Dong Bam, Cao Ngan, Chaa Hang Wards and Communes - Capacity of 10.000m3/day to serve around 150,000 dwellers
- Form: PPP – BT
- Total investment: Approximate  VND 400 billions
Treatment plant and drainage pipes have not been available in the city’s north and east. Mr. Le Quang Tien  – Chairman of People’s Committee Thai Nguyen City
Tel: 0912.999.567
14 Investment in static car parking lot in Thai Nguyen City’s center  Thai Nguyen City’s center  - Total investment: 250 billions
- Allocated 02 multi-floor car parking lots in Thai Nguyen City’s center, with an area of 3000 - 5000m2/lot, to meet parking needs for 900-1000 cars and other small parking lots 
- Current condition: the investment area is suitable to planning and convenient for investments  Mr. Le Quang Tien  – Chairman of People’s Committee,  Thai Nguyen City
Tel: 0912.999.567
15 Apartment in Trung Thanh Ward  (to replace the five-storey degraded building) Ward Trung Thanh, Thai Nguyen City - Area: 5ha
- Total investment: Approximate  VND 800 billions
- Current condition: Being 3 degraded blocks of 5-storey bulding
- Traffic: Connected with Cach Mang Thang Tam and Pho Huong roads
- Electricity: 22KV, 110 KV
- Water: Water supply from Thai Nguyen Clean Water JSC
Mr. Le Quang Tien  – Chairman of People’s Committee, Thai Nguyen City
Tel: 0912.999.567
PEOPLE'S COMMITTEE OF THAI NGUYEN PROVINCE
THAI NGUYEN DEPARTMENT OF PLANNING AND INVESTMENT
No. 18, Nha Trang Street, Thai Nguyen City, Thai Nguyen Province
Email: sokhdt@thainguyen.gov.vn / thainguyeninvest@gmail.com - Phone: 02803.855.688 - Fax: 02803.851.363
Specify the source "www.thainguyeninvest.vn" or "www.thainguyendautu.vn" when re-issuing information from this website